The work will take place in stages, with the existing bridge structure (image above) being removed on 10-11 October and the ...
The contracts form part of Thames Water’s Asset Management Period 8 (AMP8) investment programme and cover main construction ...
The contract covers the Flintshire and Wrexham area and was signed on 6 October. It runs from 8 October 2026 to 31 May 2028, ...
Hybrid threats can include cyber attacks, drone warfare and other forms of disruption which are sometimes difficult to assign ...
The framework has a total stated value of £30M excluding VAT and is divided into three awarded lots. All three contracts were concluded on Tuesday (6 ...
Across the construction and civil engineering sectors, the pressures created by economic volatility, geopolitical disruption ...
England’s nine water and sewerage companies have been criticised after failing to report more than 50,000 sewage discharges ...
The collapse occurred in February 2025 and created a hole approximately 20m long, 5m wide and 5m deep. Godstone High Street ...
Transport for London (TfL) received 553 responses to its latest consultation, including 527 from members of the public and 26 ...
Nordic countries have spent decades building infrastructure and institutions for harsher climatic and geopolitical conditions ...
The work will support the development of infrastructure intended to help decarbonise industry across the Northeast and ...
The new 400kV cable tunnel beneath the Thames, replaces the 1960s Thames Cable Tunnel and reinforces electricity transmission ...